The following is a listing of Engineering Design Details to be used on Civil Site Improvement Drawings within the Gardnerville Water Company service area.
All details are in a pdf format.
- G-1 Typical Trench 2022
- G-2 General Notes 2022
- G-3 Fire Hydrant Detail 2022
- G-4 Service Saddle 2022
- G-5 Water Service Connection 2022
- G-6 Thrust Block Table 2022
- G-7 Gate Valve Detail 2022
- G-8 Valve Box 2022
- G-9 Check Valve 2022
- G-10 Presure Reducing Valve 2022
- G-11 Combination Air Valve Assembly 2022
- G-12 Tapping Sleeve 2022
- G-13 Sampling Station 2022
- G-14 Water Sewer Separation 2022
- G-15 Water Main Lowering 2022
- RP 3+ Reduced Pressure Principal Backflow Prevention Assembly 2022
- RP Reduced Pressure Principal Backflow Prevention Assemblyl 2022
Down-loadable details in AutoCAD format will be available by link from this website at a later date. Engineers and designers that require details in AutoCAD format should contact Mark Lovelady, Manager at (775) 782-2339 or by e-mail at markl@gardnervillewater.org.